Description
The ABB 3AXD50000010152 is a factory-preassembled Inverter R9 Row Cable Package, designed as the row-level wiring kit for ABB inverter/drive cabinets built on the R9 frame size (mid-to-high power AC drives, typically in the ACS/PCS-class medium-voltage or high-low-lineup family where R9 denotes a specific cubicle/row mechanical format). Rather than a functional “module,” this is a kit of预制 cables — control cables, signal cables, and internal interconnects — with connectors pre-crimped, lengths cut to R9 cabinet layout, and tie/latching hardware included. The package is intended for row-level overhaul: when a power-row or control-row inside an R9 inverter is serviced or replaced, the cables are often the hidden time-sink (oxidised pins, embrittled jackets, “who wired this 10 years ago?”). Swapping the whole row’s cables as a kit restores the cabinet to “as-built” condition without a day of on-site measuring, cutting, crimping, and continuity-checking.
Application Scenarios
In a petrochemical plant running a 6.6 kV compressor train, the inverter feeding the main induction motor is an ABB R9-frame unit (mid-power range, ~several hundred kW to low-MW class depending on voltage). After 12 years of service, a planned “row overhaul” was scheduled: the power-semiconductor row + DC-link bus + gate-driver interface were all coming out for capacitor-reform and thyristor/IGBT refresh. The original plan was to reuse the existing row cables — until the electricians pulled the first harness and found two things: (a) the jacket on the gate-pulse twisted pair had stiffened against the heatsink (cabinet internal ~60 °C steady), and (b) one of the control-plug crimps on the I/O-to-row ribbon had a micro-crack that had caused two “gate-pulse loss” nuisances in the past six months. Re-crimping in-situ would have meant cutting the ribbon, re-pinning 24 ways, heat-shrink, re-check continuity — ~4 hours per row, two rows = lost shift. Instead, the planner had staged a ABB 3AXD50000010152 R9 Row Cable Package. The kit arrived with every cable pre-cut to R9 layout, connectors pre-moulded (control plug, signal Harting-style, gate-pulse mini-coax, 24 V auxiliary twin), plus the cable ties and standoff clips matched to the R9 DIN/panel routing. The swap: old row out → unplug all cables at both ends → lift the cable loom as one assembly → lay the new 3AXD50000010152 loom → plug → zip-tie to the same standoffs → done. Total 45 minutes per row. The plant EE’s comment: “The semiconductors are the sexy part everyone stocks. The cables are what actually bite you during the overhaul. Having the R9 kit on the shelf turned a ‘we might need an extra shift’ into a coffee-break job.”
Parameter
| Main Parameters | Value/Description |
|---|---|
| Product Model | 3AXD50000010152 |
| Manufacturer | ABB |
| Product Category | Inverter Row Cable Package (R9 Frame) |
| Applicable Frame | ABB R9 (inverter/drive cabinet frame size) |
| Kit Contents | Pre-cut control cables, signal cables, internal interconnects; moulded connectors; cable ties / fixing clips (per pack list) |
| Connector Type | Industry-standard plugs per R9 layout (control plug, signal header, gate-pulse coax/mini-ribbon — version-dependent) |
| Cable Types in Kit | Control (multi-core), signal (shielded twisted pair typical), internal DC auxiliary (24 V) |
| Jacket Rating | Typically 80 °C / 105 °C class (per ABB R9 cabinet internal spec; verify pack label) |
| Lengths | Pre-cut to R9 cabinet layout (version-dependent; do not trim — lengths are layout-specific) |
| Mounting/Route | R9 cubicle internal — along DIN/panel standoffs, through cable ducts per ABB R9 routing drawing |
| Installation Position | Between R9 row’s control unit / I/O terminals ↔ power-row modules (semiconductor, DC-link, gate driver) |
| Operating Environment | R9 cabinet internal; 0 … +55 °C ambient typical for drive lineup, up to +70 °C short-term near heatsink |
| Compliance | UL / CE component-level (cables), ABB R9 build-standard |
| Critical Note | Non-universal — R9 sub-layouts (power rating, voltage class, control-option fitout) affect cable list. Must对照设备铭牌 / 原厂 R9 layout dwg before ordering. |
WhatsApp:+86 18150087953 WeChat: +86 18150087953
Email: